The House of Representatives Committee on Women in Parliament
has said it is pushing for a law to provide death penalty for
rapists in the country.
The chairman of the committee, Taiwo Oluga, who disclosed this
in Abuja, on Tuesday, said the proposed law is part of efforts
aimed at containing the rising incidence of rape in the
country.
Oluga stated that when the law is eventually enacted, it is will
be difficult for anyone to contemplate indulging in rape.
Besides, the lawmaker said her Committee is talking with the
National Security and Civil Defence Corps (NSCDC) on the
possibility of creating an anti-rape squad that will be saddled
with the responsibility of tackling rape-related cases.
She expressed dismay that the girl child has become an
endangered specie and stated that in line with the legislative
agenda of the ninth House, the parliament will work assiduously to
protect the rights of women and girls in the country.
According to her, “The rate at which our girls are being
ridiculed; molested, is saddening…We (the Committee) are even
proposing that the penalty for rape–by the time we finish with the
bill, it will be difficult for any man to go into rape, because it
is very sad the way it is going; infact I would like that death
should be the penalty of any man that tries to rape”.
The Human Rights-Based Approach to
Carbon Finance NOW ON SALE— Order Your Copy!!!
written By Professor Damilola S. Olawuyi, LL.B
(1st Class), BL
(1st Class), LL.M (Calgary), LL.M
(Harvard), DPhil (Oxford) Professor of Law and
Director, OGEES Institute, Afe Babalola University, Ado Ekiti. For
more information or to order your copies, please
contact Mr. Keji
Kolawole: [email protected][2] , Tel:
+234 81 40000 988[1]
Subscribe ToNairalaw News! References ^
The Human Rights-Based Approach to
Carbon Finance NOW ON SALE— Order Your Copy!!!
(www.cambridge.org) ^ [email protected]
(nairalaw.com)
Read more reps-mull-death-penalty-for-rapists/
SP Ahmed Lawan
Senate Probes Gencos, Discos over unsteady power
supply
…Power Committee to submit probe report in four weeks
The Senate has mandated its Committee on Power to investigate
the activities of power generating and distribution companies with
a view to unraveling the cause of unsteady power supply in
Nigeria.
The investigating committee has four weeks to submit its report
to the Senate for consideration.
The decision by the upper chamber to probe power generation,
transmission and distribution in the country was reached sequel to
a motion considered during plenary on Tuesday.
Sponsor of the motion, Senator Chukwuka Utazi (PDP, Enugu North)
said Nigeria, with a population of 200 million and an annual growth
rate of 2.6 percent per annum, is the seventh most populous nation
on earth.
According to Utazi, the power generating or installed capacity
of Nigeria in relation to its population and Gross Domestic Product
cannot place the country to compete favourably in terms of
development with other nations.
He, therefore, called on the Federal Government to find
solutions to the power deficits faced by the country.
Citing Indonesia and Philippines as examples, the lawmaker noted
that both countries with a population of 267 million and 107
million, respectively, have installed power capacity of 60,000
megawatts and generating capacity of 42,465 megawatts as well as
installed capacity of 20,055 megawatts and generating capacity of
16,271 megawatts.
The lawmaker while expressing optimism that Nigeria can set a
realisable target of generating capacity of 100,000 megawatts in
the next ten years, said same can be achieved through a mix of
energy sources such as natural gas, hydro, coal, wind and renewable
energy.
He added that the various zones in the country are naturally
positioned to take advantage of the various energy mix and
renewables, particularly solar energy.
“The northern part of the country with vast expanse of land can
tap into large solar farms while the southern parts of the country
with significant reserves of natural gas and cola can generate
power from same.
“Both the north and South have large water bodies that can still
be dammed for hydro,” Utazi said.
The lawmaker further posited that Nigeria can improve on its
transmission infrastructure by up-scaling its networks from the
current 330kv and 132kv to 765kv super grid to enable big power
plants to send power through such grid over long distances.
He added that beyond generation and transmission, Distribution
Companies (DisCos) lack the financial and technical capacities
required, thereby resulting in their inability to pay for power
which Generation Companies (GenCos) deliver to the grid.
Underscoring the motive behind the privatization of the power
sector in 2013, Utazi stressed that the objective in privatizing
power distribution assets was not to achieve highest financial
bids, but rather to get capable companies that can achieve the
lowest Average Technical Commercial and Collection losses within
five years.
In her contribution, Senator Oluremi Tinubu (APC, Lagos Central)
said the failure of the power sector was largely due to the refusal
of the leadership of past governments to embrace new ideas.
According to her, “Government should embrace new ideas that
would take Nigeria to the next level.”
Another lawmaker, Senator Jibrin Barau (APC, Kano North) said
uninterrupted power supply remains a fundamental requirement needed
in a modern economy.
The lawmaker, who bemoaned previous policies particularly under
the administration of former President Goodluck Jonathan, said the
power problems of the country remain the same despite their
introduction.
He, therefore, called on the Federal Government to engage all
stakeholders in the power sector with a view to coming up with
workable solutions to Nigeria’s power crisis.
“We need to bring experts together to look at the power sector
as a whole in a bid to realising these targets. Our companies are
now being moved to Ghana, this is because of power.
“The Committee on Power should get everybody together.
Government cannot do it alone. Let’s bring everybody together so we
can find a lasting solution to this problem,” Barau stressed.
Senator representing Cross River South, Gershom Bassey, said
what Nigeria needs to resolve its power problem is to develop the
country’s transmission infrastructure.
According to him, Nigeria’s transmission infrastructure
currently lacks the capacity to withstand an increase to power
generation.
The lawmaker however advised the Federal Government to build on
existing policy frameworks inherited from past administrations.
Accordingly, the Senate urged the Federal Government to upgrade
the transmission infrastructure of Nigeria’s power grid for a more
efficient transmission of power.
While advocating for 100,000 megawatts installed capacity to
match the size of Nigeria’s economy and population, the upper
chamber urged the Federal Government to break-up the country’s
power distribution companies into smaller, more manageable
distribution companies for optimal performance.
Signed:
Ezrel Tabiowo
Special Assistant (Press)
to the President of the Senate
